Posted 5/9/2021 10:58 (#8995660 - in reply to #8994945) Subject: RE: post pattern tile spring prep work
C IL
No personal experience but the V plow guys say just run a FC over it. And avoid driving over the connections, which can be quite a large soft area as I understand it, to get enough volume to get the V down to depth.
There’s no trench, per day, except for the wide trench at the connections.