Tim swMN - 10/30/2020 10:46
Put a tee in the 5 inch pointed up a bit then loop around and down to the 4 inch. That will allow the 5 inch to flow and try to clean itself without having to worry about having overflow the 4 inch fill up with sediment.
Agree with Tim. The loop up allows relief but puts preference to directing down the 5. I’d dig up the 5 further downhill hoping the siltation reduces.
Also wonder if the 5 continues on past the fence or turns and might have more acres on it than you think.
All this assuming both tiles are in good shape.
Back to the trencher for me. |