| We went up. Way up. I welded 1.5" box to the top side of the arm about 18" above the truss. I then welded pieces ar a right angle so it made an L upside down. I then put 2 - 3" PVC pipes side by side. 2 10 footers with a gap between the joint. This assisted pulling wires through. Super easy, out of the way, and super easy to run things through back and forth as well as work on later. Up high and out of the way.
If you want pics, email me, I'm out of town until Tuesday. | |
|