Posted 3/15/2019 13:52 (#7382270 - in reply to #7382197) Subject: RE: Running more hoses and wires on top of draft tube
north central nebraska
I ran a 2 inch fert hose and some extra wires back on top of that tube with an angle iron on top of the hose like this ^ to hold the hose centered on top. Made some straps out of 1/8 x 1 iron to go around the top of angle iron down around the tube to hold everything on.