Posted 1/14/2021 13:17 (#8750754 - in reply to #8750748) Subject: Forgot
The Internet
The building is unloaded with the Manitou telehandler. Grain is sold in ATL's which means artic trailer loads, which are 29 tonnes. We load a trailer in 20 minutes or less depending on how far down the building we have to go. We can load inside if there is enough space, but it makes a lot of dust