Near Intersection of I-35 & I-90 Southern Mn. | Your Pin C should go to Deutsch Pin 12 which is ground
According to my notes for the Ag Leader App Rate I/O cable. This cable has a Deutsch Pin that plugs into the Application Rate module and three branches.
The implement switch branch which you would be using would have a 3 pole WeatherPak Tower with the following:
Pin A goes to Deutsch Pin 2 - 12V Power OUT to the implement switch
Pin B goes to Deutsch Pin 3 - Implement switch sense IN from the implement switch
Pin C goes to Deutsch Pin 12 - Ground OUT if you need it for something
Here's additional information for the future or others.
The flowmeter branch has a 3 pole WeatherPak Shroud with the following:
Pin A goes to Deutsch Pin 1 - 5V Power OUT for Raven Flowmeters/shaft sensors
Pin B goes to Deutsch Pin 5 - Flowmeter or shaft sensor signal IN
Pin C goes to Deutsch Pin 8 - Flowmeter Ground OUT
The radar in branch uses a 4 pin Amp connector with the following:
Amp Pin 1 goes to Deutsch Pin 7 - Radar Gun Ground OUT
Amp Pin 2 goes to Deutsch Pin 6 - Radar signal IN from an actual radar gun
Amp Pin 3 goes to Deutsch Pin 2 - Radar Power 12V OUT (shared with implement switch power)
Amp Pin 4 - Not used
Edited by tedbear 3/12/2019 11:52
|