AgTalk Home
AgTalk Home
Search Forums | Classifieds (138) | Skins | Language
You are logged in as a guest. ( logon | register )

Ag Leader App Rate Distribution Cable
View previous thread :: View next thread
   Forums List -> Precision TalkMessage format
 
tedbear
Posted 3/12/2019 09:39 (#7375376 - in reply to #7373735)
Subject: RE: Ag Leader App Rate Distribution Cable


Near Intersection of I-35 & I-90 Southern Mn.
Your Pin C should go to Deutsch Pin 12 which is ground

According to my notes for the Ag Leader App Rate I/O cable. This cable has a Deutsch Pin that plugs into the Application Rate module and three branches.

The implement switch branch which you would be using would have a 3 pole WeatherPak Tower with the following:
Pin A goes to Deutsch Pin 2 - 12V Power OUT to the implement switch
Pin B goes to Deutsch Pin 3 - Implement switch sense IN from the implement switch
Pin C goes to Deutsch Pin 12 - Ground OUT if you need it for something

Here's additional information for the future or others.

The flowmeter branch has a 3 pole WeatherPak Shroud with the following:
Pin A goes to Deutsch Pin 1 - 5V Power OUT for Raven Flowmeters/shaft sensors
Pin B goes to Deutsch Pin 5 - Flowmeter or shaft sensor signal IN
Pin C goes to Deutsch Pin 8 - Flowmeter Ground OUT

The radar in branch uses a 4 pin Amp connector with the following:
Amp Pin 1 goes to Deutsch Pin 7 - Radar Gun Ground OUT
Amp Pin 2 goes to Deutsch Pin 6 - Radar signal IN from an actual radar gun
Amp Pin 3 goes to Deutsch Pin 2 - Radar Power 12V OUT (shared with implement switch power)
Amp Pin 4 - Not used







Edited by tedbear 3/12/2019 11:52
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)