|
Monroe City, MO | Why not get a 2 x 2 tube and weld it to the angle iron that protects the edge of your floor. Let it sit on the concrete sill outside the building. Down side is it holds water inside the building if your floor slope out. Or, you could just drop it in the same location and not weld. Then just take it up when you open the door.
Not a good solution but under the circumstances you don't have a lot of options. | |
|