bullranch - 2/2/2020 13:12
This is one of those projects that spending a little more time and money on the first time is well worth it. I'm planning on adding two more lift stations in the future. It's amazing how much water our current one has moved in the 8 years we've been using it. We are running 300 acres through it.
Thanks bullranch --I may consider pouring a floor --or the sackcrete idea --pretty hard for water to pick up a hard 80# bag of concrete--pump will pump 8000 gal a min so water will be flowing
Dan
Edited by Dan Loehr 2/2/2020 13:23
|