|
Morris, IL | Looks great, wish I had 1/2 your metal fabrication skills. To answer your question yes I would for sure add chain and build a water level. They will both be useful at different times. Love to see how your cart turns out. One wet spot I tiled last fall with 4” tile about 2’ deep I got chance to try out, what what have taken 2 day was drained as soon as creek was low enough to drain away. | |
|