western iowa,by Denison | steinstarter - 9/18/2017 19:20
Have been told that the limestone floor underneath bedded packs allow moisture to filter down and away from the bedding. -I would concrete it right away (Once its saturated it will not go any where)-we have afew at 12-6'-32 and 36ft- on the wider buildings 43ft wide we are at 14 ft-good luck and don't be afraid to build it yourself |