|
southern MN | Glad you have a good attitude about it.
Seems your operation is complex enough, and you are ordering enough different mixes, that you need to come up with a way to manage those deliveries - signs posted, or designated bays and don't change things up on them.
I've used the same green wooden barge box for starter fetilizer for a decade, from the same coop with rather low turnover of drivers.... This year the fella tried real hard to find a metal gravity flow box on my place, and had to drive _right_ past the barge box that I've always had parked in the same spot along my driveway every time it's been filled for 10 years.
It's tough to be a delivery guy, I bet they have a lot of stories. Was chatting with one this spring. :)
--->Paul | |
|