|
| The soils around there can be irritating. We never move backward in performance and I always feel that the latest offering is the best configuration. That being said, if the ripple coulter works for people up front, then do it. It is only really done in a little stripe that starts in scmn and moves to right across the sd line. I don't have a problem talking about a two-pass system in some cases. There will be new ways to accesorize an individualized strip till system soon, also. I enjoy working with you, Bruce, because it is such an extreme example of the prototypical "Minnesota" conditions. You have to be so flexible! | |
|