edgerton ks. | Creek seldom exceeds one or two feet above bank, and then only for a couple hours. We are close to the top of our watershed. Just looking for ideas as how to anchor frames to concrete or wether or not they need to drop in pockets of the foundation. Culvert would be a problem here as to washing out or having water over the top. Have a small wooden bridge now and with freak pop up it can strand us there. Not good with customers if they can’t get back to their cars. Current bridge cannot carry a large truck so makes it difficult to maintain road on opposite side with gravel etc.
Edited by frank ks 11/25/2021 12:47
| |
|