AgTalk Home
AgTalk Home
Search Forums | Classifieds (100) | Skins | Language
You are logged in as a guest. ( logon | register )

Road comissioner's power to go off ROW, drainage issue.
View previous thread :: View next thread
   Forums List -> Crop TalkMessage format
 
sand85
Posted 6/9/2019 06:30 (#7549018 - in reply to #7548702)
Subject: RE: Road comissioner's power to go off ROW, drainage issue.


C IL
Now it’s a party.

Options:

1. Accept it.

2. Work with upstream landowner and road commissioner. Friendly-like. What they both did is wet probably actionable, but I’m sure they did what they thought was right at the time. You could call the county engineer and have him look at it, too.

3. Get out your checkbook and get a lawyer. If it is all as you explain, you will win. Slam dunk. But it will take 18 months and about 3-5k.

4. Alternate option, work with NRCS and see if you can get the now-gullied waterway redone including tile.

Frustrating situation as it is difficult to get made whole. As you can imagine, people call me now and call me back when they get to step 3.

I’m still going to look at those terrace files, when I get caught up.

Edited by sand85 6/9/2019 06:39
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)