Posted 11/18/2017 19:09 (#6373912 - in reply to #6373864) Subject: RE: Pouring concrete shop floor with freezing temps
Black Hawk County, IA
My concrete guy has a ground warmer. They have used it to keep the slab warm also. Laid the blankets out on top of the slab and set the temp at like 60 degrees, for three days. Some body had to check it and fill with fuel every 6-8 hours.