Posted 11/18/2017 19:28 (#6373969 - in reply to #6373864) Subject: RE: Pouring concrete shop floor with freezing temps
I wouldn't run the heat pipes. Pour it and cover with insulated blankets but just don't run space heaters in the building while your finishing and curing. Bad things will happen with the fumes. Surface will be destroyed in a year or two.