Posted 7/18/2011 01:55 (#1867754 - in reply to #1867747) Subject: RE: I need a little help in fiquring net present value of ground.......
I thought they should have been able to case it to lava rock, but I was told they only cased it 40'. I think they thought water wouldn't hurt the place. The damage was done, when I got there and found out they were drilling. I was never told about drilling for the anode rod.