Posted 7/20/2018 00:31 (#6881181 - in reply to #6880878) Subject: RE: Sandblasting a rusty trailer
central mich
We have been blasting with larger blasters for many years. Our largest pot holds 7.5 ton and has 4 blast lines.
I can assure you that with a standard single line sand blast set up it would take about 10-12 hrs of blast time to blast the frame white and that is what should be done with that trailer, including the neck.