|
Central Iowa | Connect:
G and J to A
F and H to B
D and K - unused
C - .5V to 4.5 Volts for SCV 1 control (use A and B as reference voltage/ground)
E - same as C for SCV 3 control
Setup by following the laser scraper calibration.
OR
G to A
F, H, and J to B
D, E, and K - unused
C - .5V to 4.5 Volts for SCV 1 control (use A and B as reference voltage/ground)
This gives you set points like EH Depth Control, so you could up and down detent the SCV armrest lever and the SCV will keep flowing until the voltage on C matches the setpoint voltage value.
Not sure what is best for your setup.
Digital inputs are just to determine what system is hooked up, EHDC, Laser scrapers, AutoLoad, etc.
Good Luck, post back if you get anything running.
| |
|