REDLEG
Posted 6/24/2013 21:01 (#3172532)
Subject: update on hog confinement buildings process


West Central IL

  Both foundations are completed and slat floors installed.  Carpenters began putting up the sidewalls and roof last Wednesday.  The wet spring and summer caused many delays and a great deal of additonal dirt work.  For example, the concrete pumping truck had difficulties getting in position along with the cement trucks.  A 6 young man Amish crew travels from Macomb, IL to frame the building.  We were required to lay 4 inch tile covered with rock on the north, south and east end of both buildings with an independent inspection port for both buildings.  We will connect the two tiles  and drain into a nearby  drain tile.



Edited by REDLEG 6/24/2013 21:46




(Edwards Valley Pork Co sign.jpg)



(Concrete pump truck pouring flour in north building.jpg)



(pump truck pouring north wall of north building.jpg)



(side walls with rods tied to floor.jpg)



(rerod in floor to attach additional rod for the walls.jpg)



(more pillars and sidewalls waiting for pour.jpg)



(sidewall south wall south building.jpg)



(sidewalls framed for pour.jpg)



(tile south wall of south building.jpg)



(North wall of north building with trusses laying near.jpg)



(office, storage, electrical and water space.jpg)



(left door office area, center hog loadout and right door storage area.jpg)



(looking down inside a fan and pit pump out.jpg)



(8 54inch and 2 36 inch fans east end looking west with center walk in door.jpg)



(Interior of north building west end looking east.jpg)



(gates - EIP manufacturing, Earlville, IA.jpg)



(gates, fans and other building materials.jpg)



Attachments
----------------
Attachments Edwards Valley Pork Co sign.jpg (36KB - 303 downloads)
Attachments Concrete pump truck pouring flour in north building.jpg (55KB - 287 downloads)
Attachments pump truck pouring north wall of north building.jpg (32KB - 312 downloads)
Attachments side walls with rods tied to floor.jpg (57KB - 298 downloads)
Attachments rerod in floor to attach additional rod for the walls.jpg (60KB - 289 downloads)
Attachments more pillars and sidewalls waiting for pour.jpg (53KB - 265 downloads)
Attachments sidewall south wall south building.jpg (49KB - 330 downloads)
Attachments sidewalls framed for pour.jpg (43KB - 307 downloads)
Attachments tile south wall of south building.jpg (39KB - 311 downloads)
Attachments North wall of north building with trusses laying near.jpg (36KB - 280 downloads)
Attachments office, storage, electrical and water space.jpg (33KB - 307 downloads)
Attachments left door office area, center hog loadout and right door storage area.jpg (44KB - 308 downloads)
Attachments looking down inside a fan and pit pump out.jpg (26KB - 289 downloads)
Attachments 8 54inch and 2 36 inch fans east end looking west with center walk in door.jpg (35KB - 294 downloads)
Attachments Interior of north building west end looking east.jpg (41KB - 428 downloads)
Attachments gates - EIP manufacturing, Earlville, IA.jpg (41KB - 300 downloads)
Attachments gates, fans and other building materials.jpg (48KB - 335 downloads)
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)