|
Central NC | Unit2 had it right. Here are a couple of pic from a long time ago. The first shows the boom on the feederhouse. The second is a pic after it is all loaded. In our case we would take the endgate out of the truck and bolt it to the side. After that just pick up the head and back the truck underneath the header. Next, hook up the trailer and then load the combine.
Just for scale, the header in the pic is 24'
Frank
(loading2.jpg)
(Ready to go.jpg)
Attachments ---------------- loading2.jpg (38KB - 49 downloads) Ready to go.jpg (66KB - 46 downloads)
| |
|