|
Frytown, Iowa | Remodeling the finishers and set the bins on the same side as the road. Very wet this morning and I need feed by the weekend... Do I scrape off the top soil? Add 3 in. stone and fill in with 1 inch roadstone?
What would be the best way to get the quickest (solid) driveway?
Do I need to scrape away the black soil?
Thanks
(IMAG1345.jpg)
(IMAG1346.jpg)
Attachments ---------------- IMAG1345.jpg (16KB - 208 downloads) IMAG1346.jpg (37KB - 188 downloads)
| |
|