Central Wisconsin | Heavy 8" tile put in with a chain trencher 20' deep. 400'-700' long. Can be deeper if you bench down for trencher. Works well with high water table sand. they like to have plus 10' of water on top of tile
(KIRK LAND CLEAR PROJECT 096_640x480.jpg)
(KIRK LAND CLEAR PROJECT 094_640x480.jpg)
(KIRK LAND CLEAR PROJECT 095_640x480.jpg)
(KIRK LAND CLEAR PROJECT 099_640x480.jpg)
(KIRK LAND CLEAR PROJECT 097_640x480.jpg)
Attachments ---------------- KIRK LAND CLEAR PROJECT 096_640x480.jpg (38KB - 877 downloads) KIRK LAND CLEAR PROJECT 094_640x480.jpg (54KB - 849 downloads) KIRK LAND CLEAR PROJECT 095_640x480.jpg (52KB - 854 downloads) KIRK LAND CLEAR PROJECT 099_640x480.jpg (52KB - 849 downloads) KIRK LAND CLEAR PROJECT 097_640x480.jpg (35KB - 870 downloads)
|