NC Indiana | My 4 tower (700+ ft) ran $30k each. Zimmatics low end machines were $3k more. High end was $10k more. Valleys and T & L's were $14k more. Wire was $1.32/ft, 6" pvc was $1.47, pipe and wire were laid in the same trench 2 ft a part. Guy my brother knows will do the trenching for $1.50/ ft, gets all my dealers custom trench work. Surface water used here, but well was buget was included by banker @ $20k. | |
|