|
southern Illinois | If your just running the 500 the 12 gauge with a 20amp fuse at the battery is plenty. If running the ez steer and boom controller on that same line you will need 10 gauge with a 30 amp fuse at the battery.
The 750 comes with wiring that goes to the battery and I believe it is 10 gauge with a 30 amp fuse. It is wired to run everything that you might add on the same wire like field IQ and ez steer.
Edited by commissioner 5/28/2011 14:00
| |
|