|
So. IL | You guys think its tough doing it with four guys then you should try pouring a basment floor and a garage floor with just 2 guys. Then in the afternoon, go pour another driveway and sidewalk/porch. I did the above for a year and needless to say, had enough of that crap! 40+ yards a day for 2 guys is way too much. Anyway, job looks good. Dont jump to concusions, or worry about the sealer. Sealer makes a floor very slick, and dont really do alot on a basment floor. | |
|