|
WC Iowa | Unless it is different with the new GS3 (2630), The GS2 (2600) will not accept multiple polygon field boundaries. So it looks like you need to connect them if you are using SMS to prep a GS2 card. I wish deere would accept muti boundaries but at least they have a small "cure",well atleast i dont have to modify every boundary before i import into Apex anymore. Apex now accepts mutiple exterior boundaries for one field, but so the boundaries work on a display (that cant handle mutiple polygons), apex adds little bridges to make all the exterior polygons into one when it saves the boundaries to a card. | |
|