Posted 11/10/2010 00:22 (#1429330 - in reply to #1426355) Subject: Re: RTK survey???
SD
You must survey the base and to do it you have to put the base in logging mode for 24 hours. Also, for tiling you need to be whithin 2 miles or less from the base. Verticle accuracy degrades much faster than horrizontal.