|
| The concrete contractor has graded the fill for my shop I asked for a 6" thickness. It appears that they left too much fill in. I shot the elevations and at most I will have 5" of concrete and some places more like 4.5". This is the last time I do a project without written specs. I will probably have them come out and regrade for the proper slab thickness
I guess i am P. O. ed because it seems like they are trying to sell me concrete like lumber, 6" should be 6". | |
|