|
NC IL | When selecting the event date, on the right drop your product down to the last sprayed one, and on the next screen it will ask if the direct command what its controlling off of. Thats the way it was for the integra which should be similar. Thats what got me just the other day, same region with different tank mix, if i didnt load the old reference the coverage wasnt there.
| |
|