|
| I've got a buddy that mentioned the double track a while back, I wasn't sure if it was a pipe dream or not. His time line then (year ago or so) was 5 years. Personally don't know how that would be possible, but throw enough money or enough political clout at anything and it could be done. Sidings are currently being built or rebuilt at a Rapid pace. I think BNSF knows the pipeline(s) are going in, but are preparing to take Canadian business in a Big way. Just a guess on my part. PNW ports are increasing business in a big way I think. $.02 from the peanut gallery. | |
|