Posted 1/10/2021 06:44 (#8738639 - in reply to #8735468) Subject: RE: side shooter bucket for putting sand in freestalls
Mount Upton NY
Get a Woodchuck with a cross auger not one with a conveyor. We used to bed up to 600 freestalls with one 2x per week. They are so much better than just spinning and dumping. And pretty reliable. We eventually built a sand slinger truck with 6 yard body to speed up the process. Now we are up to 2700 stalls 3x per week so are looking to set up a bigger truck with a 12 yard body.