| This pad was poured in 1994. We took the floor up the other day and it is cracked about 3' in all the way around the bin.
36' bin and would rather pour a new pad now vs having to tear the floor up in 5 years to do it.
Do you think it needs a new pad or just put the floor back down?
(bin pad 3.jpg)
(bin pad 2.jpg)
(bin pad 4.jpg)
(bin pad.jpg)