Posted 3/12/2019 07:52 (#7375122 - in reply to #7375088) Subject: RE: On this day in 2012.
n.c.iowa
Our electrical power provider has been doing a distribution upgrade here locally, been doing a lot of boring and pole setting. Contingent upon obstacles they like to run about 40” deep, they’ve had to go up to 5’ deep to stay out of the frost.