|
| In a thread below the topic of using many zones with small rate changes was offered as an option to avoid having a rate controller make big jumps between zones with significantly different rates. To me it seems like making that transition smooth is the job of the rate control system, and that trying to make that transition smoother with a prescription is a band-aid. I'm curious how many people are using this strategy and for what operations? | |
|