Sunburst Montana | I never timed it but it seemed like it took around 1 1/2 hours to do ~1,200 bushels. Its the third biggest model Almaz offers and they claim between 700 and 1,400 bushels an hour. We have an old hand crank clipper and a much bigger clipper mill in an 70 year old elevator that came with some land we bought back in 1990. If that elevator was at the home place, we probably would have taken it out and put this one in its place.
Edited by Steiger Man 1/10/2019 20:11
(1D681809-FA1A-41FF-9913-39DF789E7DB2 (full).jpeg)
(A999D42D-E75D-45BD-95E3-C3FC0B8AAA3B (full).jpeg)
Attachments ---------------- 1D681809-FA1A-41FF-9913-39DF789E7DB2 (full).jpeg (221KB - 33 downloads) A999D42D-E75D-45BD-95E3-C3FC0B8AAA3B (full).jpeg (406KB - 29 downloads)
|