|
Kansas | I have several systems running like what you have. The Ez-Boom doesn't do the rate control, that is still done with the JD system, the Ez-Boom will do the autoswathing of the booms; actually works slick. You will need a 61593 Cable from Trimble, it wires into the JD switches in the right hand console; easy to wire up. (I believe) there is also a cable that can tee into the flowmeter cable and you can view your rate from the flowmeter but still no rate control from the Ez-Boom. | |
|