central mich |
I had a 1 yard skip mixer years ago and we would buy a semi load of bagged cement. We loaded the mixer with a tractor loader and hauled it away with tractor. We could produce about 160 bags a day. We used clean bank run gravel and the concrete was fine. Prob half the price of redimix.
But a few years ago a guy that has a concrete plant said he would load my truck and it was a huge savings. About 1/2 as I recall. I think he would still do it not sure on cost. I should do exactly that as I need to pour quite a bit. | |
|