I'm looking at putting some tile in one of my farms. Were trying to hook a tile into an existing main that goes under a state highway. The best we can do is 1/2" of fall on the new tile. Is this acceptable or do we need to look at other options. The main is a 12" and we haven't decided hot big of a tile were gonna hook into it.