Posted 10/18/2009 11:43 (#889765 - in reply to #889382) Subject: RE: Soybean drying
Cen IL
What % are the beans going in at ? If their going in at 16-17%, and drying conditions are favorable, it could take as little as 2 days to dry down a 8' layer. Auger it out and repeat.