Posted 7/16/2009 01:35 (#777452 - in reply to #776747) Subject: Re: building update
Fairbury, NE (Southeast)
I like the strength of your piers too, but for all the trouble it looks like a foundation footing would go up much faster. Dig it 36-40 inches in the ground it will still be there after whatever is on top has blown away.