Working on decreasing tender trailer re-fill time and thinking about building a rack that can gravity feed multiple shuttles simultaneously into empty shuttles on the trailer. Hate swapping shuttles because I always spill some when disconnecting hoses from shuttles.
Hoping gravity flowing a full shuttle of Fulltime NXT can be done in a half hour but I’m hearing that may be a stretch. Anyone know for sure? |