Slicker than a Yes album. | Can't help much on the plow side (run different things) but as far as a backhoe goes, a skid steer one would do the job. Just not as quick or deep as a dedicated one. A good backhoe operator is gold.
Manpower is another issue. We usually split up finding tile first (2 guys) then go onto tiling. That takes at least 3, 4 if you really want smooth running and someone backfilling.
If you can find someone to volunteer for, you'll learn a lot about bedding, digging and all the other details that go into it. |