|
![](/profile/get-photo.asp?memberid=1119&type=profile&rnd=391) Macon, IL | Aint that the truth. I trenched in my own line and wired up my meter-to the spec they provided. Failed first inspection because the spec had changed in the 3 months since I got plans...no big deal had to upgrade lugs. Failed 2nd inspection due to wire type-which had failed due to a spec change in the 2 weeks between inspections.
Now I find out my box is no longer code-but since in place I can keep it.
Thanks Guys. | |
|