There is an older slurrystore pit at farm we picked up last fall. There is about 4ft or 100,000g in it. What do all these valves do? Should I just gave to open the big knife valve to flow manure out into the retention pit? What about the crank by the ladder and the plunger goibg into the concrete? Thanks