|
| The training didn't work very well for a lot of guys along with scale and air compressor failures. Right now the "new" thing is presorting for later shipment. My guy told me it's easier to get high school kids in the afternoon to help sort. Apparently times have changed as to the desires of HS students. Howver even though it's more time, it makes the morning load out go so much better. I can't say I wouldn't like a scale system that worked all the time.
Have you guys had the Schick system long enough to tell if it's going to be a long term deal? Was it more expensive that the other scale systems? thanks | |
|