West Central Alberta Coldest, wettest edge | Thanks for the responses, that is promising news. Especially the pictures of the water running while there is still snow on the ground. So, what are usual specifications for requried slope? In clay soil can the tile be placed directly, or would it need the rock as suggested by iseedit? What is the usual method for an outlet, can each pipe just open up into a ditch, or do you usually tie into progressively larger tiles? Paul, I can sympathize, My neighbour wondered why we weren't in the feilds when he was already seeding "the flat" which is low river bottom ground sitting on gravel. Then he came to borrow our cultivator and got his MFWD stuck well up on a hillside he understood then. |