|
Manitoba | I have a 7000 bus. flat bottom bin ( no aeration), that was built after the concrete pad was poured. Because of an inexperienced crew, the pad was not level....as much as 1/2 " daylight in a few places. Had a coating of molten rubber poured around the outside of the base, but it is not sealing very well. Any ideas on how to get a good seal? (No chance of getting contractor to fix it.)....thanks | |
|