|
central mich | We have completed the most difficult part on this 1998 East 5 axle pup. It was very rusty as it was used during winter in Detroit. All boxes on frame were cut out and replaced with solid flat stock. Some new crossmembers with heavier gauge. All air hose, valves, chambers ,s cam etc removed and scrapped. Some new spring hangers and springs,
Blasted white, primed with Sherwin primer same material as shipping containers, many mils of primer, Top coated with 10 gallons of black with Sherwin highest quality.
Old Aluminum box was 19.5 ft and going to install 20.5ft box with 72in sides.
Edited by jimgen 7/8/2018 17:13
| |
|